Banda me pueden pasar este texto a voz activa en inglés :(
Last summer our house was painted by me. The job took about two weeks. First, the exterior was washed using warm water and a mild detergent. Then all the chinks and pores in the walls were sealed with putty. After the putty had had a chance to dry, the exterior could be painted. A latex paint was used because it is easy to apply and cleans up with water. A whole week was needed to finish this part of the job. I was very careful to apply the paint evenly because I did not want to have to apply two coats. A color was used that was very close to the original color. Our house is a two-story house, which meant that a tall ladder was needed to do the second story. The paint can had to be balanced on the top rung of the ladder while I worked. When the job was finished, a great deal of satisfaction was felt by me. I had to pat myself on the back. Even my dad
Respuestas a la pregunta
Contestado por
0
Respuesta:
eso esta complicado mejor busca en yutu
Explicación:
Otras preguntas